DS-Plan is BREEAM Licensed Assessor and LEED Accredited Professional. Thus we are an officially authorized partner to certify buildings according BREEAM (BRE Building Research Establishment’s Environmental Assessment Method) an LEED (Leadership in Energy and Environmental Design) standard. For Details to BREEAM, LEED, and other national and international Green Building Certificates please feel free to contact our experts.
How to manage the vast amount of revisal documents of major projects? Drees&Sommer Advanced Building Technologies developed a systematic archiving concept for the Neue Messe Stuttgart.
DS-Plan wins architectural competition concerning the high-rise building with campus buildings M82 (Moosacher Straße, Munich) in collaboration with Bothe Richter Teherani (BRT) architects, Hamburg. DS-Plan is also assigned with the general planning of the engineers’ disciplines facade technology, energy consulting, building physics, and HVAC planning.
Drees & Sommer will be pleased to receive you at our partner city stands Stuttgart (H4.24), Frankfurt (R33.07), Munich (R33.08), Nuremberg (H 4.20), Hamburg (H4.30) and Luxembourg as well as on the AZA Trade stand (R32.21).
The opening event will take place on Friday, January 18th 2008 at the University of Applied Sciences for Technology and Economy, Berlin. Peter Mösle (DS-Plan) is leader of the energy division of the DGNB and will present practical experiences of innovative energy concepts.
DS-Plan develops the realignment and design of Q.Cells FM organization. With a business volume of 539 million € in 2006 Q.Cells is one of the largest producers of solar cells.
The energy demand is one of the most important aspects of an energy-efficient building. Frequently to builders and architects it is not obvious how to calculate the energy demand. DS-Plan´s reference book is supposed to help defining the criterions and to sharpen the perspective for ecological buildings.
The german magazine “Focus” exclusively presents the energy concepts of the zero-energy-building designed by Gerber Architects (Dortmund), which was developed by DS-Plan under lead-management of Peter Mösle.
At 14.02.2007 DS-Plan was awarded by E.ON Ruhrgas AG Essen with the, until now, biggest general planning contract for the new building of their head office.